Becker Electric selected by BART to upgrade the Train Control Room.

Becker Electric will be providing the installation and upgrades to a Train Control room with a battery backup system beginning in 2020.

The new station control room upgrades with the battery backup will improve the continuity and safety of the existing system. The updates will keep BART passengers safe in the event of an emergency.